Establishing Objectives, Making Assignments, And Ordering Resources In Incident Management

Establishing Objectives, Making Assignments, And Ordering Resources In Incident Management


The process to establish objectives, make assignments, and order resources is the foundational workflow of the Incident Action Planning cycle within the National Incident Management System (NIMS). This three-step sequence ensures that emergency response efforts remain organized, scalable, and focused on prioritized outcomes rather than reactive or disorganized movements. By first defining what must be accomplished, incident commanders can then determine who will do the work and what specific tools they need to succeed.


The Strategic Foundation: Establishing Incident Objectives

In the context of the 2026 NIMS guidelines, establishing objectives is the first and most critical step in any response, whether it is a localized hazardous materials leak or a multi-jurisdictional natural disaster. Objectives provide a clear, concise statement of what must be accomplished to reach a desired end state.



The Hierarchy of Priorities

Before specific objectives are drafted, the Incident Commander (IC) or Unified Command (UC) must adhere to the three primary incident priorities that govern all emergency management:



  1. Life Safety: The protection of responders, victims, and the general public.
  2. Incident Stabilization: Actions taken to stop the incident from escalating or causing further damage.
  3. Property and Environmental Preservation: The protection of infrastructure, private property, and natural resources.


SMART Objective Criteria

For an objective to be effective, it must meet the SMART criteria. Objectives that are vague, such as "control the fire," lead to confusion and resource waste. Instead, a SMART objective might be: "Complete a secondary search of all residential structures in Sector A by 1800 hours today."



  • Specific: It states exactly what needs to be done.
  • Measurable: There is a clear way to track progress (the secondary search completion).
  • Action-oriented: It starts with an action verb (Complete).
  • Realistic: The goal is achievable with the available or expected resources.
  • Time-bound: It has a hard deadline (1800 hours).

From Strategy to Tactics: Making Effective Assignments

Once the objectives are established, the Incident Command moves into the tactical phase of the planning cycle. This involves determining the "how" and the "who." Making assignments is the process of delegating authority and responsibility to specific personnel or groups to carry out the tactics necessary to meet the objectives.



Organizational Structure and Span of Control

Assignments must be made with a strict adherence to the Span of Control. In ICS, the ideal ratio is one supervisor to five subordinates, though it can range from three to seven depending on the complexity and danger of the task. If a supervisor is given too many assignments or too many teams to manage, safety and communication breakdown.

Assignments are typically organized through:



  • Divisions: Used to divide the incident geographically (e.g., North Division, Floor 5 Division).
  • Groups: Used to divide the incident by function (e.g., Triage Group, Search and Rescue Group).
  • Units: Specific functional components within the Logistics, Planning, or Finance/Administration sections.


The Role of the Operations Section Chief

While the Incident Commander establishes the overarching objectives, the Operations Section Chief (OSC) is usually responsible for determining the specific tactics and making assignments for the field personnel. The OSC evaluates the terrain, the risks, and the available personnel to ensure that assignments are assigned to the most qualified teams. Each assignment must be clearly communicated through an Incident Action Plan (IAP) or a verbal briefing to ensure the chain of command remains intact.


Resource Management: Identifying and Ordering Resources

Ordering resources is the final step in this core sequence. It is a logical progression: you cannot know what you need until you know what you are doing (objectives) and who is doing it (assignments). Resources include personnel, teams, facilities, equipment, and supplies.



Resource Typing and Categorization

To ensure clarity across different agencies and jurisdictions, NIMS uses Resource Typing. This categorizes resources by "Kind" and "Type."



  • Kind: The broad category of the resource (e.g., helicopter, medical team, bulldozer).
  • Type: The level of capability. Type 1 is generally the most capable/largest, while Type 4 is the least capable/smallest.

Ordering a "Type 1 Engine" ensures that the requesting commander receives a specific level of pumping capacity and personnel, regardless of whether the resource comes from a local department or a state-wide mutual aid agreement.



The Ordering Process

Resources are ordered through the Logistics Section, specifically the Supply Unit. In 2026, most jurisdictions utilize the Integrated Resource Ordering Capability (IROC) or similar digital platforms to track resource status in real-time. The ordering process follows a specific path:



  1. Identification: The Operations Section identifies a gap between the current resources and what is needed for the assignments.
  2. Request: A resource request is initiated (often using ICS Form 213RR).
  3. Approval: The Incident Commander or a designated official approves the expenditure or request.
  4. Logistics Coordination: The Logistics Section finds the resource, either from existing caches, mutual aid, or commercial vendors.
  5. Tracking: The Planning Section tracks the resource from "ordered" to "en route" to "checked-in."

The Tactical Planning Matrix: Connecting the Steps

The relationship between these three elements is best visualized through the use of the Operational Planning Worksheet (ICS Form 215). This form serves as the bridge between the objectives and the actual field operations. It lists the work assignments, the resources currently on hand, and the additional resources required.



Phase Responsibility Primary Focus Output
Establish Objectives Incident Commander / Unified Command The "What" and "Why" Incident Objectives (ICS Form 202)
Make Assignments Operations Section Chief The "Who" and "Where" Assignment List (ICS Form 204)
Order Resources Logistics Section / Supply Unit The "How" and "Tools" Resource Request (ICS Form 213RR)

Integration into the "Planning P" Cycle

The process of establishing objectives, making assignments, and ordering resources does not happen just once; it is a cyclical process that occurs during every Operational Period. This cycle is often referred to as the "Planning P."



  1. Initial Response: Objectives are established quickly and verbally. Assignments are made to arriving units.
  2. The Tactics Meeting: The Operations Section Chief and Planning Section Chief meet to turn objectives into specific assignments and identify resource needs.
  3. The Planning Meeting: The Incident Action Plan (IAP) is finalized. This document contains the objectives, assignments, and resource requirements for the next 12 to 24 hours.
  4. IAP Preparation and Approval: The IC signs off on the plan, and the Logistics Section begins the formal ordering of any resources not already on scene.
  5. Operations Briefing: The new assignments are handed out to supervisors, and the cycle repeats.

Common Pitfalls in the Planning Sequence

Even experienced incident management teams can struggle with this sequence. One of the most frequent errors is Resource-Driven Planning. This occurs when a commander looks at what resources they have available and then creates objectives based on those tools. NIMS dictates the opposite: Objective-Driven Planning. You must define the need first, then acquire the tools.

Another common issue is Span of Control violations during the assignment phase. In the rush of an evolving incident, it is easy to assign ten different tasks to a single Division Supervisor. This inevitably leads to a lack of oversight and increased safety risks. If the assignments exceed the supervisor's ability to manage them, the IC must expand the organization by adding Branches or more Groups.

Finally, ordering resources without a clear assignment leads to "staging area bloat." Resources arrive on the scene but have no clear task, leading to wasted funds, logistical headaches (feeding and housing personnel), and potential interference with active operations.

FAQ



What is the difference between an incident goal and an incident objective?

In emergency management, a goal is a broad statement of intent, such as "Suppress the wildfire." An objective is a specific, measurable step taken to achieve that goal, such as "Establish a containment line from Point A to Point B by midnight." Objectives support goals.



Who is responsible for ordering resources if a Logistics Section is not yet established?

In the initial stages of an incident or in smaller-scale responses, the Incident Commander retains responsibility for all functions not delegated to a section. If a Logistics Section has not been activated, the IC or the Operations Section handles the resource requests directly through their agency's dispatch or emergency operations center (EOC).



Can assignments be changed mid-operational period?

Yes. While the Incident Action Plan provides the framework for the operational period, the Operations Section Chief has the authority to make tactical adjustments based on changing conditions on the ground. However, significant changes that alter the overall objectives must be communicated to the Incident Commander.



How does "Resource Typing" help in ordering resources?

Resource typing ensures that when an Incident Commander orders a "Type 2 Search and Rescue Team," they receive a team with a standardized number of personnel, specific training levels, and required equipment. This eliminates ambiguity during inter-agency responses where "one team" might mean different things to different organizations.



When should the demobilization of resources begin?

Demobilization planning should begin as soon as resources are ordered. As objectives are met and assignments are completed, the Planning Section identifies resources that are no longer needed. This ensures that personnel can return to their home jurisdictions and reduces unnecessary costs.

Implementation Recommendations for Incident Commanders

To master the sequence of establishing objectives, making assignments, and ordering resources, agencies should prioritize regular multi-agency training exercises. In 2026, the complexity of threats—from cyber-physical attacks on infrastructure to extreme weather events—requires a seamless transition between local and state-level resource coordination.

Commanders should utilize digital ICS software to maintain real-time visibility of resource status and use standardized forms (ICS 202, 204, and 215) even in smaller incidents to build "muscle memory." By strictly following the objective-first approach, incident management teams ensure that every action taken and every dollar spent is directly contributing to the safety and stabilization of the incident.